Maintenance and Upgrades

User guide to the ayedo SDP 5-maintenance-train model: roles, workload preparation with PDBs and probes, and checking for deprecated Kubernetes APIs.

Maintenance and Upgrades

Regular updates and security patches are the foundation for stable, secure, and compliant operation of the ayedo Software Delivery Platform (SDP). This page explains the platform's maintenance model and shows how to prepare your applications cleanly for maintenance activities and upgrades.

The 5-Maintenance-Train Model

On the SDP, changes are deliberately separated into five decoupled maintenance trains. This separation prevents unnecessary dependencies and keeps the risk of every update manageable:

Maintenance Train Scope Typical Responsibility (Managed SDP)
1. OS & Host Linux security updates, kernel patches, host reboots Platform Operations
2. Kubernetes Patch and minor upgrades of the Kubernetes version (k3s control plane & workers) Platform Operations
3. Platform Components CNI (Cilium), Ingress/Gateway (NGINX, Envoy), cert-manager, policy and security components Platform Operations
4. Dependencies Databases (e.g., CloudNativePG, MongoDB), registry (Harbor), observability, backup components Platform Operations or by agreement
5. Application Release Your own container images, Helm charts, and app configurations Development Team / Customer

For Self-Managed instances of the SDP, scheduling and executing all five trains lies with your own operations team; maintaining the logical separation of trains is equally recommended there.

Shared Responsibility During Maintenance

Even when platform operations coordinates and rolls out OS, Kubernetes, and platform upgrades systematically, your application architecture determines whether end users notice anything at all:

  • Platform Side: Executes upgrades in a structured manner, drains nodes cleanly before reboots, and respects defined PodDisruptionBudgets.
  • Application Side: Ensures multiple replicas are running, pods shut down gracefully, readiness probes respond accurately, and no deprecated Kubernetes API versions are used.

How to Prepare Your Workloads

1. Multiple Replicas and Distribution Across Nodes

A Deployment with only a single replica is inevitably unreachable briefly during a node reboot. Run production workloads with at least two replicas and spread them across different nodes:

spec:
  replicas: 2
  template:
    spec:
      topologySpreadConstraints:
        - maxSkew: 1
          topologyKey: kubernetes.io/hostname
          whenUnsatisfiable: ScheduleAnyway
          labelSelector:
            matchLabels:
              app: my-app

2. Define PodDisruptionBudgets (PDB)

A PodDisruptionBudget tells Kubernetes how many pods must remain available simultaneously during planned node drains:

apiVersion: policy/v1
kind: PodDisruptionBudget
metadata:
  name: my-app-pdb
  namespace: acme-production
spec:
  minAvailable: 1
  selector:
    matchLabels:
      app: my-app

3. Readiness Probes and Graceful Shutdown

During a node drain, Kubernetes removes a pod from Service routing and then sends SIGTERM:

  • Readiness Probe: Ensures new pods only receive traffic once the application is genuinely ready.
  • Graceful Shutdown: Your application should catch SIGTERM, stop accepting new connections, and complete in-flight requests cleanly.
  • terminationGracePeriodSeconds: Adjust the grace period if your application requires longer than the default 30 seconds to shut down cleanly.
spec:
  terminationGracePeriodSeconds: 45
  containers:
    - name: my-app
      readinessProbe:
        httpGet:
          path: /ready
          port: http
        initialDelaySeconds: 5
        periodSeconds: 5
      lifecycle:
        preStop:
          exec:
            command: ["sh", "-c", "sleep 5"]

4. Check for Deprecated Kubernetes APIs

Ahead of Kubernetes minor upgrades, older API versions are periodically removed (for instance, legacy v1beta1 resources). Regularly verify that your Helm charts and GitOps manifests use current, stable API versions:

  • networking.k8s.io/v1 for Ingress
  • policy/v1 for PodDisruptionBudget
  • autoscaling/v2 for HorizontalPodAutoscaler
  • batch/v1 for CronJob and Job

Useful tools for statically checking your manifests before an upgrade include pluto or kubent run directly against your Git repositories or namespace.

5. Make Database Connections Resilient

Maintenance on database dependencies (such as CloudNativePG or Managed MongoDB) can involve a planned primary failover. Configure your application drivers so that:

  • dropped connections are automatically re-established (connection pooling with reconnect),
  • read/write operations briefly retry on transient errors (retry logic),
  • applications connect via the provided Service DNS names rather than hardcoded pod IPs.

Rollforward Over Rollback

For application releases (Maintenance Train 5), follow the principle of fixing forward (rollforward) or — for stateless services — a controlled revert to the previous immutable image tag via GitOps (Argo CD).

Pre-Maintenance Checklist

  • [ ] Production workloads run with replicas >= 2 and a properly configured PodDisruptionBudget
  • [ ] Readiness/liveness probes and SIGTERM handling have been tested
  • [ ] Manifests and charts do not use deprecated Kubernetes API versions
  • [ ] If needed, a targeted Grafana Silence is set for planned app maintenance
  • [ ] Current backups for databases and persistent data have been verified

Further Reading